View Catalogue  
Request Catalogue  

Pilotseal Fitting Instructions

STEP 1

PF1.jpg

Removing the old gasket and clean the boiler casing and cover plate jointing surfaces.

STEP 2PF2.jpg

do not use any grease, adhesives or jointing compounds

STEP 3

PF3.jpg

Ensure the gasket is the correct size for the cover plate.

STEP 4

PF4.jpg

Keep cover plate central within the aperture and tighten the crab clamp bolt. Tighten it only sufficiently to avoid leakage, this is vital to avoid overload of the rubber gasket when the boiler pressure is achieved.

STEP 5

PF5.jpg

Maintain light tension on bold during the service period (normally 12 months)

Sort by

Follow us